Site Clearing


Site clearing or construction on any property within Bloody Point is not permitted until the Builder meets with
the Bloody Point ARB Representative, strings the perimeter of the property, stakes out the proposed structure and
marks the trees that are to be removed; and then the ARB will issue a “Clearing and Foundation” permit. Site clearing material must be transported in a covered truck and must
not extend beyond the width of the truck’s bed. Site clearing limitations are the same days as outlined in trash
hauling.

 